Flexible Nuclear Energy for Clean Energy Systems., Technical Report, September 2020.
LucidCatalyst (2020)..Cost and Performance Requirements for Flexible Advanced Nuclear Plants in Future U.S. Power Markets.Report for ARPA-E MEITNER Program..
Expert Group on Resource Management of the United Nations Economic Commission for Europe (2021).https://ourworldindata.org/nuclear-energy.
European Commission (2021) JRC Science for Policy Report:.He was right, in some circumstances.
The problem is that such simple rules, although alluring, can be unhelpful or plain wrong in other circumstances..When lecturing my students, I discuss the dis-economy of scale.
How large processes need large peak demands of inputs, how many design factors are not linear so doubling the size of a process can mean 4x or 8x the energy, the time, or the effort.For some processes, a colony of ants would be much more efficient than a brontosaurus..